Order No. 1208 on control and supervision of subsidy payments and other services related to power generation equipment.
Country
Type of law
Regulation
Abstract
This Order applies to network and transmission companies, as well as to Energinet.dk’ s supervision and control of payments for subsidies in adherence to Electricity Supply Act; to the recovery of costs for grid connection of power generation equipment in adherence to article 67 of the same Act; and to the recovery of costs for wind turbines to the grid and costs connected to the grid, according to the provisions stipulated in article 30 of the Act on Promotion of Renewable Energy. With this document, provisions are set to ensure that measurement of supplied energy is being properly registered in order to establish exact costs thereof. Penalties for non-compliance shall be subject to fines detailed in article 12.
The Order consists of 6 Chapters: Scope and definitions (1); Supervision and control of payment (2); Master data registry of power generation equipment (3); Measurement and control of measurement (4); Appeals and penalties (5); Entry into force (6).
The Order consists of 6 Chapters: Scope and definitions (1); Supervision and control of payment (2); Master data registry of power generation equipment (3); Measurement and control of measurement (4); Appeals and penalties (5); Entry into force (6).
Attached files
Web site
Date of text
Entry into force notes
1 December 2014.
Repealed
No
Source language
English
Legislation status
in force
Legislation Amendment
No
Original title
Bekendtgørelse om kontrol og tilsyn med udbetalinger af pristillæg og andre ydelser til elproduktionsanlæg.