Order No. 1299 on subsidy for energy produced in industrial heat and power plants.

Country
Type of law
Regulation
Source

Abstract
This Order applies to subsidies for electricity production from industrial combined heat and power plants, in adherence to article 58c of the Electricity Supply Act. Subsidies shall be determined by provisions of articles 3-5 on the basis of the plant's power generation, and may be granted regardless of whether already other facilities have been awarded. Subsidy may be disbourses in the period between 1 January 2013 and 31 December 2020. Applications for subsidy shall be submitted to Energinet.dk. The grants are conditional upon Energinet.dk's authorization on all matters of importance for their eligibility, amount and duration. Notification shall be made as soon as these conditions are met.
The Order consists of 7 Chapters: Scope and definitions (1); General rules for subsidies (2); Applications for subsidy (3); Annual, netting, modification or repayment of subsidy (4); Decisions and appeals (5); Penalties (6); Entry into force (7).
Date of text
Entry into force notes
27 November 2015.
Repealed
No
Source language

English

Legislation status
in force
Legislation Amendment
No
Original title
Bekendtg relse om tilskud til elektricitet produceret i industrielle kraft-varme-v rker.