Governmental Decree No. 610 validating the Regulation on connection to the unified electric power system of business entities generating electric power, also from renewable energy sources.

Country
Type of law
Regulation
Source

Abstract
This Regulation determines the procedure for connection of business entities generating electricity, including from renewable energy sources, to the electric power grids of the unified electric power system and ensures non-discriminatory access of business entities to the electric grids. At the same time, the requirements of this Regulation shall apply to the following cases: (a) connection to the unified electric power system of newly commissioned capacities of the electric power producer; (b) increase in capacity of the producer's previously connected electric installations; and (c) change in the connection point of the producer's previously connected electric installations to the unified electric power system. Manufacturers, including those who have installed generating sets in private residential buildings, have the right to connect to the unified electric power system according to the procedure established by this Regulation, according to the scheme according to Appendix 1. The manufacturer's electrical installations shall be connected to the optimal point of the unified electric power system. In order to connect its electric installations to the unified electric power system, the manufacturer shall be obliged to obtain technical specifications for connection of new or additional generating capacities from the organization to which the connection to the power grids is supposed to be made.
Date of text
Repealed
No
Source language

English

Legislation Amendment
No
Original title
ПОСТАНОВЛЕНИЕ КАБИНЕТА МИНИСТРОВ РЕСПУБЛИКИ УЗБЕКИСТАН ОБ УТВЕРЖДЕНИИ РЕГЛАМЕНТА ПОДКЛЮЧЕНИЯ К ЕДИНОЙ ЭЛЕКТРОЭНЕРГЕТИЧЕСКОЙ СИСТЕМЕ СУБЪЕКТОВ ПРЕДПРИНИМАТЕЛЬСТВА, ПРОИЗВОДЯЩИХ ЭЛЕКТРИЧЕСКУЮ ЭНЕРГИЮ, В ТОМ ЧИСЛЕ ИЗ ВОЗОБНОВЛЯЕМЫХ ИСТОЧНИКОВ ЭНЕРГИИ.