Order No. 1063 on grid connection of wind turbines and on surcharge for wind-generated electricity.

Country
Type of law
Regulation
Source

Abstract
This Order lays out definition and rules on the implementation of wind turbines on land and at sea in regards to energy connection via transmission grids. Windturbines that are connected to the grid or to a consumer installation after 20 May 2003 must have their own billing metering in adherence to Energi.net regulations. Windturbines of less than 25kW are exempt from this regulation. Scrapping schemes for onshore windturbines of 150kW or less may acquire certification thereof if oscrapped between 3 March 1999 and 31 December 2003. For windturbines of 450kW or less dismantled in the period from 15 December 2004 to 15 December 2011 certification thereof shall be granted for connectivity between 1 Januar 2005 and 31 December 2011. Grid-connection companies shall submit a statement with the number of consumed full load hours as of 1 April 2001. Notification is updated by each payment of surcharges.
This Order consists of 12 Chapters: Scope, definitions and common terms (1); Cost allocation of grid connection (2); Definition of existing wind turbines (3); Disposal arrangements for onshore windturbines (4); Opting out of surcharges (5); Transport of wind turbines (6); Information (7); Decisions (8); Calculation of full load hours of existing wind turbines as of 1 April 2001 (9); Appeals (10); Penal provisions (11); Entry into force (12).
Date of text
Entry into force notes
This Order enters into force on 15 September 2010.
Notes
Repealing Order No. 1365 of 15 December 2004.
Repealed
No
Source language

English

Legislation status
in force
Legislation Amendment
No
Original title
Bekendtg relse om nettilslutning af vindm ller og pristill g for vindm lleproduceret elektricitet.