This content is exclusively provided by FAO / FAOLEX

Regulation No. 681 on external quality assurance and authority under the Energy Act.

Country
Type of law
Regulation
Source

Abstract
This Regulation sets rules on the planning of new power line construction, requiring the preparation of a conceptual study with details requirements and alternative concepts. The planning shall ensure to provide an external quality assurance authorized by the Ministry. The Regulation applies to the Concept of Principle solution meeting the needs of the energy system; to large power line constructions ( one or more plants that require construction license in adherence to article 3-1 of the Energy Act to a voltage level of min. 300 kV and to a min. length of 20 km); to the upgrading, rebuilding or extension of installations for electric energy supply. Operation of existing facilities shall not preclude rebuilding or upgrading for limited transitional period.
Date of text
Entry into force notes
1 July 2013.
Repealed
No
Source language

English

Legislation Amendment
No
Original title
FOR 2013-06-21 nr 681: Forskrift om ekstern kvalitetssikring og vedtaksmyndighet etter energiloven.