This content is exclusively provided by FAO / FAOLEX

Decree on the concession for the use of the Sava River for the production of electricity in the hydroelectric power plants HE Moste, HE Mav i e and HE Medvode.

Country
Type of law
Regulation
Date of original text
Source

Abstract
This Decree determines the area of the Sava river water resource, in which a concession is granted for the production of electricity at the sections of the HPP Moste, HPP Mav i e and HPP Medvode hydroelectric power plants. This text further prescribes the necessary conditions for the implementation of related concession, the duration of the concession and the amount of payment for such concession, which is proportional to the duration of the water right here granted. The concessionaire can use the Sava River in the sections of HPP Moste, HPP Mav i e and HPP Medvode exclusively for the production of electricity. The operating regime of HP Moste HPP, HP Mav i e HPP and HPP Medvode is specified in the hydroelectric power plant usage permits. The concessionaire must ensure the operating regime of the hydroelectric power plants, which optimally utilizes the potential energy of the Sava River, taking into account the requirements of environmental protection. The concession for the use of water for the production of electricity from the Sava River at the sections of HPP Moste, HPP Mav i e and HPP Medvode is granted for 50 years.
Date of consolidation/reprint
Entry into force notes
This text entered into force on 22 February 2003.
Notes
Consolidated version
Repealed
No
Publication reference
Official Gazette of the Republic of Slovenia 13/2003-143/2020
Source language

English

Legislation status
in force
Legislation Amendment
No
Original title
Uredba o koncesiji za rabo reke Save za proizvodnjo elektri ne energije v hidroelektrarnah HE Moste, HE Mav i e in HE Medvode.
Implements