This content is exclusively provided by FAO / FAOLEX

The Urban and Spatial Planning (Installation of an Energy Storage System in combination with approved projects for the production of electricity from Renewable Energy Sources with the required permits) Special Development Decree no. 142 of 2025.

Country
Type of law
Regulation
Source

Abstract
This Decree, made under provisions of Town and Country Planning Law, applies to the installation of an energy storage system in combination with a project for the production of electricity from renewable energy sources that has secured a planning and building permit. The Decree prohibits the installation of the electricity storage system in the following areas: conservation and protected area; airport special zone; cultural heritage area; tree protection area. The Decree specifies conditions for installing the electricity storage system, including soil protection measures, granting land property rights, and compliance with water pollution control measures and waste disposal provisions.
Date of text
Repealed
Yes
Serial Imprint
Official Gazette of Cyprus Republic, issue III, no. 5947 of 2025.
Source language

English

Legislation Amendment
No
Original title
Το περί Πολεοδομίας και Χωροταξίας (Εγκατάσταση Συστήματος Αποθήκευσης Ενέργειας σε συνδυασμό με εγκεκριμένα με τις απαιτούμενες άδειες έργα παραγωγής ηλεκτρικής ενέργειας από Ανανεώσιμες Πηγές Ενέργειας) Ειδικό Διάταγμα Ανάπτυξης Αρ. 142 του 2025.